Solana Daily New Wallets Up 124% but Exchange Order Book Depth Drops 28%

Solana's daily new wallet creation reached approximately 1.71 million in early October, marking a 124% increase since early September. However, the order book depth for SOL on eight centralized exchanges decreased by over 28% compared to 2025 levels. Santiment reported the data on X on October 7, noting that daily active addresses also rose 58% to about 4.27 million during the same period.
Wallet and address counts are indicators of network activity but do not directly reflect new individual users. According to CoinGecko's September 30 report, SOL orders within a ±2% price range on eight centralized exchanges dropped from approximately $28 million (KRW 374 billion) in both directions in 2025 to about $20 million (KRW 268 billion) in 2026. Order book depth reflects the volume of pending buy and sell orders around current prices, with shallower depths potentially amplifying price impacts from large orders.
Exchange liquidity rankings varied by price range: MEXC led near market price, while Bitget and Coinbase ($COIN) dominated in wider ranges beyond ±$0.20. Within the ±2% range, Coinbase's buy-side depth exceeded $6 million (KRW 80 billion), with sell-side depth at $4 million (KRW 54 billion).
Network activity and order book depth measure different aspects of Solana's ecosystem—network engagement versus exchange liquidity. Neither metric alone can determine whether the wallet growth offsets selling pressure or impacts SOL's price.
Korean Source
This article is an English localization of a Korean-language crypto news report. Original headline: 솔라나 신규 지갑 124% 늘었지만 거래소 호가 깊이는 28% 감소